Difference between revisions of "Development"
(→Buildfarm) |
|||
Line 33: | Line 33: | ||
== Buildfarm == | == Buildfarm == | ||
− | : The Pgpool-II project runs the regression test everyday. The result is mailed to [https://pgpool.net/mediawiki/index.php/Mailing_lists buildfarm mail list]. Also the regression test results including errors ca be downloaded [https://pgpool.net/buildfarm here]. | + | : The Pgpool-II project runs the regression test everyday. The result is mailed to [https://pgpool.net/mediawiki/index.php/Mailing_lists buildfarm mail list]. Also the regression test results including errors ca be downloaded [https://pgpool.net/buildfarm here]. The data is kept up to last 7 days. |
Revision as of 00:38, 22 June 2021
Contents
How to contribute to the Pgpool-II project
- Pgpool-II is an open source project and the contribution style follows the way PostgreSQL does except that we don't have CF application.
- Source code is managed by the git repository.
- We maintain 5-6 stable branches (see https://pgpool.net/mediawiki/index.php/EOL_information for more details). The under development branch is always the master branch. We don't add new features to stable branches. New features should be added to the master branch.
- New feature proposals should be discussed on the pgpool-hackers mailing list
- The proposal should include reason, back ground, architecture design, and the most important thing: why this is good for users (and developers). The proposal need not to be completed. Just throwing an idea to start a discussion is welcome.
- Actual code should be proposed as a patch to the master branch. A patch does not need to be included in the first, or early discussions.
- The committable patch should include not only complete code, but documentation (SGML format) and possibly tests (under src/test).
- Once the patch is verified by committers, a committer will commit/push the patch to the master branch.
Projects in progress
Projects already done
Buildfarm
- The Pgpool-II project runs the regression test everyday. The result is mailed to buildfarm mail list. Also the regression test results including errors ca be downloaded here. The data is kept up to last 7 days.